Ceiling suspended system -Laminate finish

The Ceiling suspended system is perfect for prestigious office buildings. A premium product for use in dry areas only.

TYPE B - Post forming grade laminate coved at junction of division and frontal, all vertical front edges of doors & frontals are profiled. Horizontal edges are finished in matching laminate.

TYPE C - Post forming grade laminate coved at junction of division and frontal, all edges are finished in matching laminate.

Technical Specification

Partitions
Divisions substrate - 18mm high moisture resistant particleboard Frontals substrate -33mm high moisture resistant particleboard Finish - Select laminate
Edges -Self edged
Suspension system -I00mmx 50mm parallel flange channel fixed in ceiling space above the line of frontals & doors. The channel is supported at walls at each end on 75mmx75mm mild steel angles that are bolted to walls with 10 mm diameter bolts. All metal work is finished in anti-rust coating.
Support - Purpose made mild steel droppers are welded to the support beam at partition centres and positioned at the level of the underside of the finished ceiling.10mm diameter rods are fixed through the frontals and securely fastened to the droppers on the suspension beam, enabling the partitions to be supported from the ceiling without floor supports.
Division wall track - 25mm x 25mm purpose made aluminium channel
Wall nib track - 40 mm x 25mm purpose made aluminium channel
Aluminium track finish - Clear anodised or powder coated
Fixings -Stainless steel

Doors
Substrate -33mm high moisture resistant particle board
Finish - Select laminate
Edges - Self edged

-Hinge set - Invincible Heavy duty hold-open gravity
type lift-off hinges
-Invincible Indicator bolt with staple
-Invincible Flush bumper/stop
-Invincible Coat hook bumper

Finish -Satin chrome plate (powder coat available)
Fixings - Stainless steel

Kirkbuild Advise
Recommended Use areas:
Considered prestigious/premium product because of post formed laminate profiles to partitions and doors
Dry areas only - no showers or hose out situations
Ideal for prestigious office buildings

Installation:
Installed in two stages:
1/ Install suspension steel work
2/ Install partitions when all works to ceilings, walls and floors are completed
DEGREE OF DIFFICULTY TO INSTALL -
STEEL WORK DIFFICULT OWING TO ACCURACY REQUIRED.
PARTITIONS EASY PROVIDING ACCURACY MAINTAINED.

Problems:
Manufactured in one piece, so can be bulky. Easily damaged during transport and handling. So great care has to be taken. Cubic tonnage higher than flat pack.
USE FURNITURE REMOVALIST FOR TRANSPORT
Little tolerance built into the system, so care has to be taken with set out, if ceiling is installed out of level with droppers

Cost: Cost is dependent on laminate selection
HIGH PREMIUM / PREMIUM / MODERATE / ECONOMICAL

Click on images
to enlarge



Technical Drawing #5



Technical Drawing #7